Method

Understand, build, verify, evolve.

Active step

Understand the decision

Which decision needs to be better prepared, by whom and in what context?

An approach in six successive decisions: each produces concrete outputs and allows us to continue, review or stop.

Overview

Six steps, six go/no-go decisions.

Each step produces deliverables and ends with a decision: continue, review or stop.

UNDERSTAND → MEASURE → DESIGN → EVALUATE → INTEGRATE → OPERATE

  1. 01

    Understand the decision

    Which decision needs to be better prepared, by whom and in what context?

    Activities
    Observe the actual work, interview users, map information, exceptions and responsibilities.
    Deliverables
    Decision map, stakeholders, pain points, representative cases and scope limits.
    Go/no-go decision
    Continue if the problem and its owner are identified; review or stop if the objective remains abstract.
    Expected involvement
    Provide access to the people who do the work and to the examples that reveal its difficulties.
  2. 02

    Establish the benchmark

    How does the work operate today and against what should an improvement be compared?

    Activities
    Describe the baseline situation, choose quality, cost, time and risk criteria, then build the test cases.
    Deliverables
    Documented benchmark, acceptance criteria, evaluation set and hypotheses to test.
    Go/no-go decision
    Continue if an honest comparison is possible; review the measure if it artificially favours the solution.
    Expected involvement
    Validate the criteria and provide representative cases, including difficult ones.
  3. 03

    Design and prototype

    What minimal architecture makes it possible to test the hypothesis without building too early?

    Activities
    Define data, model, rules, interface, checks and human validation points; build a targeted prototype.
    Deliverables
    Functional architecture, prototype, register of choices and test protocol.
    Go/no-go decision
    Continue if the prototype makes the use testable; review if complexity still obscures the initial question.
    Expected involvement
    Test the journeys and arbitrate trade-offs between coverage, control and integration effort.
  4. 04

    Evaluate quality and errors

    In which cases does the system help, make mistakes or need to abstain?

    Activities
    Compare with the benchmark, analyse errors, check sources and traceability, test out-of-sample where generalisation is at stake.
    Deliverables
    Reproducible results, error typology, thresholds, abstention rules and documented limits.
    Go/no-go decision
    Continue if the benefit justifies the risks; review or stop if critical errors cannot be controlled.
    Expected involvement
    Qualify the business severity of errors and accept the conditions of use.
  5. 05

    Integrate and accept

    How can the system be embedded in existing work, tools and responsibilities?

    Activities
    Connect services, secure access, handle errors, document operations and run acceptance testing.
    Deliverables
    Integrated application, acceptance scenarios, documentation, recovery procedure and operating responsibilities.
    Go/no-go decision
    Go live once the agreed scenarios are accepted; correct before opening if a blocking risk remains.
    Expected involvement
    Involve users, technical managers and the person authorised to sign off acceptance.
  6. 06

    Operate and improve

    Does the system remain useful, reliable and sustainable over time?

    Activities
    Monitor quality, usage, incidents, costs, data drift and change requests at an agreed pace.
    Deliverables
    Monitoring dashboard, incident log, quality reviews and prioritised roadmap.
    Go/no-go decision
    Maintain, develop, reduce or withdraw depending on observations and the value actually produced.
    Expected involvement
    Report business changes, take part in reviews and arbitrate developments.

Illustrative example

Processing a document file, from the document to human review.

  1. 01

    Receive

    Sort the documents, check the formats and flag what is missing.

  2. 02

    Extract

    Identify the useful information while keeping the link to its original location.

  3. 03

    Compare

    Apply the agreed rules, cross-check the sources and bring out contradictions.

  4. 04

    Propose

    Prepare a summary with sources, level of uncertainty and abstention cases.

  5. 05

    Check

    Have the result validated, corrected or rejected by the person responsible.

  6. 06

    Trace

    Keep versions, decisions and errors useful for improvement.

Quality is judged against the current work; cost includes processing, verification and operation; time is measured over the complete journey, not just the model’s response.

Quality and errors

An error does not carry the same weight in every profession.

Sources

When an answer depends on documents or references, the system must make their origin consultable in the intended context.

Abstention

When a case falls outside the scope or lacks information, not answering may be the expected behaviour.

Traceability

Useful versions, inputs, actions and validations are retained according to the project’s requirements.

Out-of-sample

To assess generalisation, the evaluation sets aside data or periods that the model did not use for fitting.

Useful glossary

Model
A mechanism that turns inputs into an estimate, a classification, text or another result. On its own, it does not carry the context of use.
Application
The interface and functions with which a person carries out a task.
System
The whole formed by data, model, application, rules, checks and human organisation.
Agent
Software that can chain actions within a given scope. Its tools, permissions and stopping points must be defined.

Start with the decision to improve.

Scoping clarifies the question, the current benchmark and the go/no-go criteria.