Sources
When an answer depends on documents or references, the system must make their origin consultable in the intended context.
Method
Active step
Which decision needs to be better prepared, by whom and in what context?
Overview
Each step produces deliverables and ends with a decision: continue, review or stop.
UNDERSTAND → MEASURE → DESIGN → EVALUATE → INTEGRATE → OPERATE
Which decision needs to be better prepared, by whom and in what context?
How does the work operate today and against what should an improvement be compared?
What minimal architecture makes it possible to test the hypothesis without building too early?
In which cases does the system help, make mistakes or need to abstain?
How can the system be embedded in existing work, tools and responsibilities?
Does the system remain useful, reliable and sustainable over time?
Illustrative example
Sort the documents, check the formats and flag what is missing.
Identify the useful information while keeping the link to its original location.
Apply the agreed rules, cross-check the sources and bring out contradictions.
Prepare a summary with sources, level of uncertainty and abstention cases.
Have the result validated, corrected or rejected by the person responsible.
Keep versions, decisions and errors useful for improvement.
Quality is judged against the current work; cost includes processing, verification and operation; time is measured over the complete journey, not just the model’s response.
Quality and errors
When an answer depends on documents or references, the system must make their origin consultable in the intended context.
When a case falls outside the scope or lacks information, not answering may be the expected behaviour.
Useful versions, inputs, actions and validations are retained according to the project’s requirements.
To assess generalisation, the evaluation sets aside data or periods that the model did not use for fitting.
Useful glossary
Scoping clarifies the question, the current benchmark and the go/no-go criteria.